|

This
oil & gas finder technology can be used as a tool to
make multi-million dollar decisions:
- Block evaluation during new acquisition.
- Block relinguishment.
- Side track / horizontal drilling as well as
drilling prioritization / dry-hole probability
elimination.
- Re-visit dry-holes for second look.
HREM is a combination of well log modelling, seismic
interval velocities, electrical field analysis, and
magnetic field analysis. It is anonshore CSEM
(Controlled Sourced Electromagnetic) technology.
The
factors creating electromagnetic anomalies are known :
- Deep tying of the geoelectrical anomalies.
- Change of petrophysical properties of reservoirs.
- High resistance of hydrocarbons.
- Increasing of mineralization of underground waters
in contact zones.
- Presence of system of dynamic balance of electric
currents and charges inside the field.
One
advantage of HREM technology is combining HREM results
and structural maps of productive intervals of an area,
resulting in distribution schemes of improved reservoir
characteristic zones. It gives a probability of
hydrocarbon accumulation contour detection,
determination of exploratory-appraisal well location or
determination of operating wells drilling sequence. |